新加坡西部居民或將實現10分鐘抵達地鐵站

2024/11/27   •   3973閱
新加坡交通部高級政務部長許連碹在國會闡述了「45分鐘城市」願景,並介紹了為改善西部交通連通性所採取的措施,包括地鐵網絡擴展、巴士服務優化以及未來新地鐵線路(JR L和CRL)的規劃。旨在提升西部居民的出行便利性和就業機會。

Looking ahead, a key enabler of our plans to enhance transport connectivity in the West are our two new MRT lines – the JRL and CRL.

The JRL will be a game-changer for the West when it opens in stages between 2027 and 2029. With 24 new stations spanning 24 kilometres, it will serve areas such as Tengah New Town and Jurong Lake District, and also connect residents across the entire Western region to growing employment centres in Jurong. With three interchange stations at Choa Chu Kang, Boon Lay and Jurong East, the JRL will connect to the North-South Line and East-West Line, and enhance resilience across the system.

The JRL will shorten travel times for commuters in the West. For example, residents in Tengah Plantation Grove can reach Tanjong Pagar in 40 minutes via a rail connection to Jurong East interchange, compared to 55 minutes today. Similarly, residents in Boon Lay View will take 40 minutes to travel to Woodlands, down from 55 minutes today.

For the connection between the Jurong Town Hall station on the JRL and the Jurong Lake District station on the CRL, Mr Leong will be pleased to know that there will be good pedestrian connectivity between the two stations.

By the early 2030s, the CRL will further enhance the West's connection to the East and North-East regions. It will serve areas such as West Coast and parts of Clementi that do not currently have direct links to the rail network and connect residents to growing employment centres in Punggol and Changi. Commuters in the West will be able to use the CRL to connect to every radial line in our MRT network.

It will also shorten travel times significantly for some journeys. Currently, a journey from West Coast to Pasir Ris will take 70 minutes and a journey to Ang Mo Kio will take 60 minutes. With the CRL, these journeys will be reduced to 45 minutes to Pasir Ris and 30 minutes to Ang Mo Kio.

In the mid-2030s, the new Sungei Kadut interchange station along the North-South Line will provide commuters in the Northwest a more direct transfer to the Downtown Line. The new Brickland station between Choa Chu Kang and Bukit Gombak stations will also offer residents living in Keat Hong, Bukit Batok West and Tengah faster and more convenient access to the rail network.

Beyond these projects, we are also planning for the next bound. As Minister Chee mentioned earlier, LTA has been studying a West Coast Extension in tandem with further developments in the area, which will connect the JRL to the Circle Line and further improve rail connectivity and resilience for the West.

At the same time, we recognise that buses remain integral as they enable more residents to access the rail network and other amenities. This is especially important as new housing developments are being completed at a faster pace, which means that there are new needs that have to be met. We recognise that as the planned expansion of our rail network will take some time to complete, improving bus connectivity will help meet travel demand in the immediate term.

That is why we have taken further steps through the recently announced Bus Connectivity Enhancement Programme. Some measures include introducing more peak-hour express bus services for faster connection to the city as well as new "express feeder" services, which will bypass stops to take a more direct route to connect residents in farther away estates to existing transport nodes and town centres.

Mr Leong's suggestion for buses is no different from this. We will also speed up the pace of introducing new trunk and feeder bus services and improving bus frequencies to improve connectivity for the early batches of residents who move into new estates like Tengah. LTA is progressively identifying these enhancements, in consultation with stakeholders.

Beyond improving transport connectivity, we are also bringing jobs closer to residents. With the development of regional centres like the Jurong Lake District and Jurong Innovation District, residents in the West will have even more employment opportunities close to home.

Mr Speaker, while we have made substantial progress, we are not done building a more connected Singapore. Our plans to improve transport infrastructure will take time. So, I seek the patience and support of Singaporeans and our residents in the West as we press on with enhancements to our public transport network in the coming years.

With the support of this House, I am confident that we will realise our vision of a well-connected and vibrant home for all residents. [Applause.]

HQ丨編輯

HQ丨編審

新加坡國會丨來源

上一頁
2/2

及時獲取本站更新:

設為 Google 偏好來源

AI衝擊、育兒壓力、全球新市場!新加坡新任政務部長揭秘未來工作重點

2026/09/01   •   244閱

新上崗AI「機器人職員」小印度地鐵站初登場 乘客:既可愛又可怕

2026/09/01   •   2276閱

終於等到了!武吉巴督、淡濱尼等全島6大巴士轉換站將大翻新!乘客設施、車長休息室全面升級

2026/09/01   •   82閱

新加坡陸路交通局迎來新掌門!前內政部常任秘書接任主席,開啟交通新篇章

2026/08/31   •   163閱

三年內入住成熟市鎮!新加坡逾1200個BTO單位2030年竣工

2026/09/02   •   82閱

新加坡從居者有其屋到居者有其選,住房選擇越多越好嗎?

2026/08/31   •   735閱

新加坡面對的永恆的天大難題

2026/09/02   •   88閱

蝸居時代來臨?新加坡開始流行放下一張床就滿了的防空壕迷你房?犧牲空間換省錢!

2026/09/01   •   248閱

​新加坡地鐵站公廁尿斗僅隔60cm 使用者背靠背進退兩難

2026/09/02   •   81閱

新加坡60年GDP從30億飆到8000億,副總理卻潑了一盆冷水

2026/08/31   •   2601閱

緊急提醒!新加坡-馬來西亞關口九月假期將迎來人潮,最高排隊3小時!

2026/08/31   •   324閱

新加坡科研投入280億,NTU人迎來哪些新機會?

2026/09/01   •   486閱

新加坡碩士畢業兩年,我是怎麼拿到PR的真實經歷

2026/09/01   •   1135閱

GetGo推跨國駕駛服務 獅城租車開往西馬

2026/09/02   •   6閱

新加坡28歲女子超粘60歲巴士車長男友,為不讓男友上班報假警……

2026/08/31   •   1381閱

豪擲370億新幣!新加坡公布RIE2030計劃:要把頂尖科研全部變成真金白銀!

2026/08/31   •   247閱

緊急提醒!新加坡-馬來西亞陸路關卡將迎來高峰,假期出遊千萬別被堵在路上!

2026/09/01   •   9閱

新加坡人平均月薪到底是多少,看完這組官方數據就懂了

2026/09/01   •   3321閱

9月學校假期迎通關人潮 新加坡移民局吁提前規划行程

2026/09/01   •   410閱

Singapore|新加坡學生安全短途游・五日景點連載

2026/09/01   •   407閱

放慢腳步!在新加坡過最chill的一天,原來獅城人這麼會享受生活

2026/08/31   •   1379閱

獅城摩天觀景輪遇事故 入稟法庭索賠900萬

2026/09/02   •   165閱

烏節路開車又要花錢了!新加坡LTA宣布11個地點恢復ERP收費,詳情看這裡

2026/09/01   •   250閱

新加坡中元節:歌台還在唱,觀眾去哪了?

2026/09/01   •   2437閱