新聞 · 約 29 分鐘閱讀

新加坡西部交通大升級!45分鐘內到市中心

2024/11/30
直接閱讀正文 ↓

The Government will argue that the upcoming Jurong Region Line (JRL) and Cross Island Line (CRL) will improve connectivity in the West. But even after these two lines are built, the East-West Line will still be a major bottleneck for travel between the East and West of Singapore for residents of the West. This is because the JRL connects only to the East-West Line for east-west travel.

The West of Singapore is not some "ulu" hinterland. It is home to very dense population centres such as Jurong West, upcoming new towns such as Tengah and major employment hubs in Jurong East and Tuas. Existing towns, such as Queenstown and Bukit Merah, will also soon be redeveloped and densified and many new jobs will be created in the Jurong Lake District. All these residents and jobs need to be better connected to the rest of Singapore.

Currently, for a resident of Choa Chu Kang, Bukit Batok, Pioneer or Jurong West, working somewhere in the Downtown Core, like Raffles Place, a 45-minute commute by public transport to their workplace is still far from reality. This is very different from the East where entire new towns, such as Marine Parade and Bedok and even parts of Tampines, are accessible from the Downtown Core within 45 minutes.

And on top of the Downtown Core, we must also strengthen connections from the West to other parts of Singapore. With decentralisation and greater job mobility, residents of the West could find themselves working in the Punggol Digital District or Changi Business Park. While a 45-minute commute may never be feasible for them because of sheer distance, we can do more to reduce their commuting times as much as possible.

Today, I would like to suggest two approaches to improve rail connectivity and bus services to relieve residents in the West from their dependence on the East-West Line so that we can be closer to realising the vision of a 45-minute city in the West.

The first approach is to improve rail connectivity for the West by connecting the JRL to the Circle Line and CRL. There have been two unconfirmed proposals regarding this.

The first proposal is to extend the JRL from Pandan Reservoir to Haw Par Villa on the Circle Line. This will allow residents in Tengah, Bukit Batok West, Ayer Rajah and West Coast to travel to the Downtown Core by MRT with just one transfer at Haw Par Villa. It could also benefit students travelling to and from the National University of Singapore. This proposal was first announced by then-Transport Minister Lui Tuck Yew in 2015. Later, in 2022, then-Transport Minister S Iswaran updated that feasibility studies are still ongoing, even though this potential extension appears to have been dropped out of the Master Plan 2040.

The second proposal is to build an interchange infrastructure to connect Jurong Town Hall station on the JRL with Jurong Lake District station on the CRL. These two stations are within walking distance of each other but are not currently planned to be connected as an interchange. Then-Minister S Iswaran also said, in 2022, that the authorities would study this as, "We need to create meaningful connections in our MRT stations for convenience and resilience."

These two proposals to extend the JRL will greatly increase rail connectivity from the West to the Downtown Core and the rest of Singapore. We are glad that, this morning, Minister Chee Hong Tat has mentioned that the Ministry of Transport will look into these proposals.

The second approach to improve public transport in the West is to introduce a network of inter-town skip-stop bus services. This can be implemented relatively quickly, compared to increasing rail connectivity. These skip-stop services would be different from existing express bus services. They will only stop at a few high demand stops in each town throughout the entire route to allow commuters to connect between towns more quickly. They will also run all-day, in both directions, at good frequency. The existing routes that stop at all stops can be still retained to feed commuters from the lesser-demand stops to the high-demand stops.

Two types of skip-stop bus services should be introduced. The first type is the long-distance skip-stop bus services that connect different towns in Singapore. In the West, we currently have services 30 and 143, which provide important inter-town connections for residents of Teban Gardens, Pandan Gardens and West Coast, which are areas currently not served by MRT to the East and Central Singapore. There are also services, such as 180 and 974, which link Bukit Panjang with Boon Lay and Jurong West.

All these are important long-distance inter-town bus services that complement our MRT network, but they are too slow. Basic bus services travel at about 15 kilometres per hour, about half the speed of the MRT. While we currently have faster express buses like Service 30e, many of them only operate during peak hours. What we need is a network of skip-stop buses to complement the MRT in moving people between towns quickly. This is especially important for areas currently not served by MRT.

The second type of skip-stop services is to connect more far-flung areas to key transport nodes and community hubs faster. These may be similar to the "express feeder" bus services that LTA is going to introduce under the Bus Connectivity Enhancement Plan. For example, we should introduce skip-stop service 870E to connect Tengah with Jurong East MRT and a skip-stop service 871E to connect Tengah with Bukit Gombak MRT and Beauty World MRT. These will be much faster than the current services 870 and 871. We can also introduce a bus service linking Tengah and Boon Lay, which is something many Tengah residents have asked for during my engagement with them.

The Progress Singapore Party (PSP) urges LTA to seriously consider using the Bus Connectivity Enhancement Programme as an opportunity to boldly reimagine our bus system. This should be done at a national level, but it is especially important in the West, where rail connectivity is not as good as the East, but the commuting population is fast building up. Mr Speaker, in Mandarin please.

(In Mandarin): Mr Speaker, last month, an unprecedented six-day massive disruption occurred between Jurong East and Boon Lay stations on the East-West Line. This made Singaporeans living in the western part of Singapore, especially in Jurong West, Jurong East and Clementi, realise how reliant they are on the East-West Line as a critical rail infrastructure.

In the Land Transport Master Plan 2040 released by the Land Transport Authority in 2019, a vision was set that by 2040, Singapore would become a "45-minute city", meaning that 90% of public transport journeys during peak hours could be completed within 45 minutes. However, for residents in the west, this vision is far from reality at present.

PSP believes that to achieve this vision for western residents, the Government should implement two proposals currently under study regarding the JRL.

The first is to extend the JRL from Pandan Reservoir station to Haw Par Villa station on the Circle Line. The second is to connect Jurong Town Hall station on the JRL with Jurong Lake District station on the CRL to form an interchange station.

及時獲取本站更新:

設為 Google 偏好來源

繼續閱讀

新聞

新加坡宏茂橋3道突發改道,一封就是三年半

新聞

新加坡地鐵可靠度破紀錄,平均每跑338萬公里才延誤一次

新聞

地鐵可靠度提升 平均故障間隔公里數首破300萬

新聞

新加坡西部PSI破208創新高,全島開放超300處避霾點

新聞

武吉班讓輕軌系統翻新工程大致完成 可靠度有所提升

社會

突髮狀況!地鐵施工竟挖出「神秘障礙物」,AMK Hub周邊道路將大改18個月!

生活

新加坡街頭「奇景」:拎著西服去上班

社會

僅用3個月!新加坡4人小團隊竟把紅燈攝像頭變成「測速神器」,違章率暴跌66%!

新聞

中央快速公路8A出口 四天凌晨非繁忙時段暫關閉

新聞

耗資814萬新元!新加坡自動駕駛公共巴士試點卻被叫停了?

新聞

擁車證A組B組擬合併 低價車或減1.5萬新元 新加坡陸交局徵詢公眾至11月2日

社會

突發!地鐵施工挖出神秘障礙物,宏茂橋 Ave 3 將面臨 18 個月交通大調整!

新聞

ActiveSG關閉中南西部部分設施 北部和東部維持開放

新聞

獅城中部PSI創新高 升至226點非常不健康水平

新聞

組屋外牆當投影螢幕看影片 網民:想起戶外電影院

新聞

新加坡義順巴士站三車連環撞,兩車衝上人行道3名乘客送院

新聞

新加坡煙霾爆表!政府緊急發錢:看醫生最高只需10新幣!

社會

像進了《寂靜嶺》!新加坡霧霾對比照刷屏,網友驚呼:我還以為圖片沒加載出來

新聞

撞婦拖行80米判監吊牌 車長辯事故「獨特」且「神秘」 上訴遭法官駁回

社會

告別排隊!新加坡ICA宣布伍德蘭關卡啟用摩托車自動通關,速度快了10%!

社會

新加坡陷入嚴重煙霾危機!中部地區空氣品質極不健康,多地設施緊急關閉

新聞

全島PSI全線破百!新加坡煙霾捲土重來,雷雨救場恐難斷根

新聞

兀蘭關卡部分汽車道開放摩哆通關 ICA提醒:須獲指示才能駛入

新聞

巴士碾過六旬婦拖行逾80米致死 車長定罪上訴遭駁回